North Mercedes Benz Heavy Truck Factory Grid Project
Engineering span: 102m
Project length: 262.5m
Total building area: 26775㎡
Engineering features: Adopting welded ball joints, with a maximum ball diameter of 820mm.
Our advantages
▶︎Long-span: the structure can span up to 200 meters without internal pillarsto maximize internal space.
▶︎Fantastic: flexible structure, variable shape,large span & loading; fantasticappearance; eco-friendly; optimized minimum-consumed design.
▶︎Long-life: durable materials & finishes (galvanized & stainless steel,composites, factory-applied finishes) for lower price with the same lifetime.
▶︎ Facilitated: fully mechanical/bolted joint leads to easy construction and lowcost; considerate packing for transportation and assembly process.
Contact: Mr.Lu
Phone: +86-51668601029
E-mail: hbktech@163.com
Whatsapp:
Add: 1412, Building 2, Vanke Huaihai Xintiandi, Block 3, Quanshan District, Xuzhou City, Jiangsu Province
We chat